Access and scheduling
Once the notice date is set, work out when the club actually closes. Many owners keep the old floor open until the last evening and move overnight or across a weekend, which we can do on request, so members lose as few days as possible. The flooring installer tells us when each room can take foot traffic and when it can take rolling loads, which are different days.
At the new site, ask the landlord about the loading door, freight elevator, and hours. A club on an upper floor of a Boston building may need the elevator booked in blocks and a certificate of insurance on file, which we can provide. Plaza gyms along Route 9 and Route 1 usually load through a rear door. For street loading in Boston or Cambridge, the city may need a street-occupancy permit for the truck.