Access and scheduling
Each site's date depends on its landlord turnover and the general contractor's punch list, so we schedule one site at a time rather than the whole rollout at once. For every address we note the delivery door, truck position, staging space, elevator or dock booking, and when the sign installer and technology vendor need the floor.
A Boston storefront may limit curb time or loading hours; a plaza unit usually shares a rear door with its neighbors; a new pad site may have a finished floor that needs runners from the first cart. Many landlords want a certificate of insurance naming them before the first delivery, and we can issue one for each property on request. Deliveries after hours or on a Saturday can be planned where the property allows.
