Access and scheduling
Get the property manager's move-in rules before booking. A mall or managed center may name a service door, corridor route, floor-protection rule, hours, and truck position, and usually wants a certificate of insurance naming the landlord, which we can issue on request. If the new unit is still being fitted out, confirm the day the general contractor hands over the sales floor.
Teardown order follows the path out. Runs nearest the receiving door come down first, and oversized pieces such as showcase bodies and long base decks get measured against the service door, elevator, and corridor turns. At the new store we unload in the order the plan is built, usually perimeter wall fixtures first, then floor gondolas, then tables and forms, so parts can be staged beside the positions they will fill.