Skip to main content
Business & Professional Offices

Architecture and Engineering Firm Moving in Boston

Flat files, rolled drawing sets, wide-format plotters, study models, and the materials library, moved between submission deadlines.

(774) 421-9389
Two Eastside Movers crew members outside a client's red front door
  • Licensed & Insured Fully Covered
  • Owner-Operated By Tyler Trefrey
  • 10 States Northeast Served

Start your free engineering & architecture firm move quote

verified For estimate purposes only credit_card_off No credit card required

Planning a Engineering & Architecture Firm Move

Design firms own furniture that no ordinary office has. Stacked flat files full of original drawings, racks of rolled sets, a wide-format plotter or two, a materials library that took years to build, and study models that nobody wants to see damaged. Deadlines are the other problem: a permit set, a bid, or a design review can land any week, so the move date is set by the project calendar, not the lease.

We plan around both. Flat-file stacks come apart into their individual cases, and each drawer is taped shut or pulled and carried flat, depending on how heavy it is and what is inside. Rolled sets travel in tubes or bins marked by project number. The plotter is made ready by whoever services it, and the sample library is boxed shelf by shelf so your designers find finishes where they left them. Models are the studio's call: small ones ride in boxes your staff pack, and large presentation models are crated through our custom crating service.

Who usually signs off
Studio principal or operations manager, with project leads identifying live drawing sets and the equipment contact approving plotter preparation
Timing that works
A weekend between submission dates, on request, picked after project leads mark permit sets, bid deadlines, and client presentations on the calendar.

What typically moves

  • Stacked flat-file cases and plan drawers Stacks separate into cases; drawers are taped or removed and carried flat, each marked with case and drawer number.
  • Rolled drawing sets and hanging plan racks Sets travel in tubes or bins by project number; hanging clamps stay on their rack.
  • Wide-format plotters and large scanners Moved upright once the service tech or your IT contact has parked heads and pulled ink and media.
  • Finish samples and the materials room Each bay's samples go in small, heavy-duty boxes marked with bay and shelf on two faces.
  • Study and presentation models Small models in boxes your staff pack; large models crated, with the studio deciding which is which.
  • Pin-up boards, layout tables, and drafting stools Boards are padded and moved upright; tables come apart where the hardware allows.

Access and scheduling

Ask each project lead for the next submission dates, then find the gap. Many studios move on a weekend, on request, with a pack-up day on Friday afternoon so the last print run is done before the plotter is taken down.

Architecture practices cluster in Fort Point and the Seaport, the Leather District, Back Bay, and Cambridge, often in older brick buildings with small freight elevators and loading on a narrow street. A full flat-file case may not fit an older freight car, so we measure the cab before the date and plan to break stacks down on the floor. Engineering firms in suburban parks along 128 and out toward 495 usually have better loading, but longer carries. Downtown landlords generally want our insurance paperwork before booking the elevator; we send it on request.

Protection and handling

Original and stamped drawings do not get replaced easily, so flat-file drawers never ride open or stacked on each other. Heavy drawers travel in their case with tape across the front; lighter ones come out and ride flat on padded carts. Tubes and bins stand in the truck rather than lie loose.

Plotters are tall, top-heavy, and sensitive to tipping, so they move upright with padding and are never laid on their backs. Sample library boxes are kept small because tile, stone, and metal samples get heavy fast. Models go last onto the truck and first off. Workstations with large twin monitors are unplugged, wrapped, and set at their desks; rendering software, licences, and shared project drives stay with your IT provider.

Who does what

Some of this job belongs to other trades. The written plan names each one.

Plotter preparation and re-commissioning
The plotter's service vendor or your IT contact parks the heads, removes ink and media, and runs a test plot in the new plot room.
Large presentation models
The studio decides which models travel and how; we crate the large ones through our crating service or carry boxes your staff pack.
Old drawing archives headed off-site
Your records vendor collects and keeps them; we can stage the boxes for its pickup.

Not part of our work

  • Sorting, filing, or discarding drawings, which stays with the project leads.
  • Servicing or calibrating plotters and scanners.

Around Boston and MetroWest

Boston's design firms have long worked out of the brick warehouse buildings of Fort Point, the Leather District, and the South End, along with Back Bay offices and buildings near Harvard Square and Kendall Square in Cambridge. Engineering and survey firms spread out along Route 128 in Needham and Dedham and in the I-495 office parks from Marlborough to Mansfield.

The crew that shows up

Two Eastside Movers crew members outside a client's red front door

Engineering & Architecture Firm Moving FAQs

Another question? Call (774) 421-9389.

How do flat-file cabinets full of original drawings get moved without emptying them?

It depends on weight. The first step is splitting each stack into single cases. Lighter cases can travel with drawers taped shut, but a case packed with heavy paper usually needs its drawers pulled and carried flat on padded carts, each marked with its case and position. Nothing rides open, and nothing is stacked on a loaded drawer.

Who should get our wide-format plotter ready for a move?

Whoever services it, usually the dealer or your IT provider. The printheads need parking, ink cartridges and media rolls come out, and some models have transport locks. Once it is released, we move it upright with padding and set it at the new plot room, and the service tech tests it there. Book that visit for the first morning.

Can the materials library go back in the order our designers are used to?

Yes. We box it shelf by shelf, with each box labeled for its bay and shelf on two faces, and unpack nothing ourselves unless you ask. At the new office the boxes are set at the matching bay, so your staff can reload shelves in order. Heavy tile and stone samples go in small boxes.

What happens if a submission deadline lands on the week we planned to move?

Move around it. Most studios keep the plotter and the project team for that deadline in place until the set is out, then move them last on a later weekend. The rest of the office can go first. We would rather split the move over two weekends than pack a team with a deadline.

Plan your business move

Tell us both addresses, the building rules you know about, and the dates you cannot move. We will send back a written plan and estimate.

Call (774) 421-9389

Mon–Sat 8:00 AM – 5:00 PM

Call Now call 774-421-9389