Access and scheduling
Get the summer calendar before the room list. Your facilities lead tells us which rooms are cleared, when floors in each room are being stripped and refinished, and when the finish has cured enough for furniture. We sequence moves so no room fills with chairs before its floor is done. Where a dealer is delivering new furniture, the old pieces usually need to be out first.
For each building, we need the loading door, elevator or stair routes, door widths, and any areas summer programs are using. Many older Massachusetts school buildings have stairs and no elevator, which sets the pace on upper floors. If a leased building needs a certificate of insurance, we provide it on request, and evening or weekend work is possible when the school authorizes access.